Bob's Metelcasting needs a new CNC router and I decided that this one would be built from new material. Then I saw the price of the linear bearings at $125 and decided to build them myself. The dimensions are exactly the same as the manufactured bearings so that they can be swapped out at a later date.
|
|
The design, scaled up 1.8% to allow for shrinkage.
|
|
Machining 2 bearing cases.
|
|
Installing the bronze bushings.
|
|
The top is glued on and machined.
|
|
The finished foam bearing.
|
|
Sprue, runner and wire support with 2 thin coats of joint compound. The hardware grade rod is left in place so that the bushings don't move.
|
|
The pour. Video 971kb lb_pour.wmv
|
|
The crud on this casting is the result of running my Vacuum Casting Box while pouring. It looks like a ruined casting but it easily chips off.
|